Loading... Please wait...

Steel Fixing SWMS

Steel Fixing SWMS

Steel Fixing SWMS Video
  • Product Description
  • Product Reviews
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Steel - Fixing Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with steel reinforcing in concrete.

This Safe Work Method Statement (SWMS) provides guidance on steel fixing. In particular, this SWMS details the risk management processes and procedures that need to be followed when setting and tying steel reinforcing bar for concrete construction. This SWMS is designed to be used as a stand-alone document however Steel Fixing Work may incorporate other ‘high risk’ construction activities such working at heights, or working with Tilt–up concrete construction (a full list of regulated ‘high risk’ activities is defined in s291 Work Health and Safety Regulations 2011) If any of these listed activities are undertaken as part of a project, a dedicated SWMS must incorporate that activity.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related Items:

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES
Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST