Loading... Please wait...

 

Support Vehicle - Earthmoving SWMS

$79.95

PLUS GST

View Cart


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery

This SWMS includes:

    • PPE
    • Safety Notes
    • Planning
    • Preparation
    • Set-up
    • Operation
    • Emergency Procedures
  • References
  • 13 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Safety Information:

The Support Vehicle - Earthmoving Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure.

It outlines the safety steps for the duties associated with site maintenance of trucks for earthmoving equipment. 

Duties include Fuelling, Tyre Pressure Maintenance, Attachment Transport and Greasing (with compressor driven air greaser). 

The Support Vehicle - Earthmoving Procedure is ready to use and is not a blank template.

Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Support Vehicle - Earthmoving Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Related Items: Manual Handling

 

Pre Operational Inspection

  • Hoists:
    • Daily/pre-operational inspection
    • SWL displayed and suitable for load
    • Annual inspections/maintenance undertaken
    • Good condition
    • Positioned safely
    • Safety devices working
    • Dropper bar fitted
  • Hydraulic Jacks:
    • Daily/pre-operational checks
    • Routine maintenance - 3 monthly
    • Instructions available
    • SWL displayed and suitable for load
    • Vehicle stands used
  • Ramps:
    • Daily/pre-operational checks
    • Routine Maintenance - 3 monthly
    • SWL displayed and suitable for load
  • Note: Where equipment is jacked, avoid loose dirt. Ensure ground is compacted - preferably concrete.
  • Ensure all machinery placed safely (wheels chocked, hand brake applied)
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!


Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST