Loading... Please wait...
Request a Quote

Let us help you get started with your health and safety obligations.

Request your free Safe Work Method Statement quote today!

1300 306 604

Let us create a safety compliance package that suits your needs.

Call us today to get your free quote!

Over 300, ready to use Safe Work Method Statements to choose from

1300 306 604

Table - Surface - Planer Operation SWMS

Table - Surface - Planer Operation SWMS

Table - Surface - Planer Operation SWMS Video
  • Product Description
  • Product Reviews
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

This SWMS is comprehensive document outlining the the safety steps, main hazards, risks and controls associated with operating a table planer covering the operation of a Table Planer under normal operational conditions and situations. A Table Planer is used to make a flat surface on a piece of timber in preparation for planning with a Thicknesser and/or for making straight edges on timber pieces. Table Planers are sometimes referred to as Surface Planers.

Persons operating a table planer can be exposed to hazards such as:

  • moving parts
  • excessive noise and dust
  • & flying debris.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES