Loading... Please wait...Product Details:
Timber Floor Sanding & Polishing Information:
The Timber Floor Sanding & Polishing Safe Work Method Statement (SWMS) is a comprehensive 15 page procedure. This SWMS involves the use of a floor sander on indoor timber floor then polishing using varnish or similar floor coating.
The Timber Floor Sanding & Polishing procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Timber Floor Sanding & Polishing Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
Storing Coating:
Remove all furnishings, floor hardware, curtains, items in cabinets etc. Cover items that cannot be removed with plastic and duct tape.
Seal all voids with heavy plastic and duct tape. Include:
Prepare floor.
Provide mechanical extraction for dust control as needed.
We Accept:
Can't find what you're looking for?
Call our customer service team
1300 306 604Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST