Loading... Please wait...

Image 1
 

Traffic Plan - Establish - Zone Guidelines SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Traffic_Management_Roadside_Construction_Guideline_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery
  • Provides a framework for training workers
  • Addresses generic risks and hazards
  • MS Word format allows you to make changes to the document
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
  • Assists with compliance requirements for WHS inspections

The Guidelines for Establishing a Safe Work Zone on a Roadside is a comprehensive document outlining the safety steps for the management of traffic around a roadside work area.

The purpose of this guideline is to provide the PCBU (person conducting business or undertaking) with information to assist in the identification of effective Traffic Management Risk Controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of any traffic related incidents.

Reference must be made to relevant State Legislation – OH&S / Road Traffic Authority and Council. Further, this guideline will assist PCBUs in establishing the content of the Traffic Management Plan (TMP) for the roadside activity.

Work on or near a road is defined as “High Risk Construction Work" by Work Health and Safety Regulations 2011.

These guidelines include:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Emergency Procedures
  • Review
  • References

These are guidelines and not a blank template. Simply add your company details, ABN, follow the guidelines and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Product Details:

  • Minimum 9 pages
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section

Related items:

  • Manual Handling – Hazardous Manual Tasks

Product extract:

Particular attention must be given to ensuring that:

-       All signs are easy to read and road users can easily navigate their way through the work zone

-       Adequate buffer zones between road users and the worksite have been created

-       Suitable speed restrictions are in place relevant to the road type / work type and proximity to work zone

Ensure speed limit of

Ensure, where barriers are present:

-       No workers go beyond barriers

-       Adequate clearance between barrier and work area

-       Water barriers are compatible, appropriately secured / filled

Monitor work position at all times throughout operation. Ensure:

-       No standing behind reversing vehicles

-       Alertness at all times. Listen for:

  • o   Reversing alarms/beepers
  • o   Calls from other Operators

-       Alert for breaches of exclusion zones

-       Maintain awareness of traffic movement if near road

On completion

-       Ensure all debris is removed from work site

-       Ensure all traffic control devices are removed when no longer required

Ensure traffic control devices are collected in a safe manner

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!

Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST