Loading... Please wait...

Image 1
 

Wacker Packer SWMS

$79.95

PLUS GST

View Cart


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery

The Safety Procedure includes:

  • Risk Assessment
  • Operators Requirements
  • Planning & Pre-Start Checks
  • Re-Fuelling
  • Starting
  • Operating
  • Completion
  • Transportation
  • Long Term Storage
  • Risk Ratings
  • 4 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

General Wacker Packer Safety Information:

The three page Safe Work Procedure outlines the Safety Steps required when operating a Wacker Packer.

Wacker Packers need to be used with caution and appropriate safety procedures. The Wacker Packer procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Wacker Packer Safety Notes Extract)

When Operating a Wacker Packer:

  • Never start the machine on a hard surface. Always start it on lose soil or gravel.
  • Ensure the engine is cool prior to re-fuelling.
  • Check that all safety devices and guards are in good working order before operating.
  • Always use the handle to guide the Wacker Packer.
  • Place the throtle in idle on completion.
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!

Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST