Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Concrete waffle pod raft system

Concrete Waffle Pod Raft System Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Concrete Waffle Pod Raft System Safe Work Method Statement

This Concrete Waffle Pod Raft System Safe Work Method Statement (SWMS) covers hazards and controls, associated with handling, delivery and placement of wet concrete being placed into a waffle pod raft system. 

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Concrete Waffle Pod Raft System SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Delivering Materials, Subgrade Preparation, Concrete Delivery
  9. Working with Powered & Non-powered Tools
  10. Setting-out/Profiling Building Lines
  11. Subgrade Preparation
  12. Waffle Pod Placement
  13. Setting Steel & Formwork
  14. Placing Concrete & Finish
  15. Fuelling Small Engines On-site
  16. On Completion
  17. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Concrete Waffle Pod Raft System Safe Work Method Statement

This Concrete Waffle Pod Raft System Safe Work Method Statement (SWMS) covers hazards and controls, associated with handling, delivery and placement of wet concrete being placed into a waffle pod raft system. 

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Concrete Waffle Pod Raft System SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Delivering Materials, Subgrade Preparation, Concrete Delivery
  9. Working with Powered & Non-powered Tools
  10. Setting-out/Profiling Building Lines
  11. Subgrade Preparation
  12. Waffle Pod Placement
  13. Setting Steel & Formwork
  14. Placing Concrete & Finish
  15. Fuelling Small Engines On-site
  16. On Completion
  17. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View