Loading... Please wait...

Water Truck Operation SWMS

Water Truck Operation SWMS

Water Truck Operation SWMS Video
  • Product Description
  • Product Reviews
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

 This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with the driving and operating a diesel or petrol fuelled Water Truck, including delivery of water and spraying of water on ground surfaces. Water trucks have a spray boom fitted to the rear of the truck to spray water for the purpose of dust suppression.

This SWMS does not cover changing tyres on Water Trucks, or driving water trucks on Mining sites and does not cover hazardous manual tasks, traffic control, working with the general public, dust suppression or noise control in sufficient detail. Dedicated SWMS should be developed for these tasks, and for any risks not covered in this SWMS.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Before Operating A Water Truck - Extract only:

  • Ensure all personnel has a suitable truck license before operating vehicle.
  • The controller of the worksite is to perform the risk assessment tests.
  • Ensure that all motors within the area are turned off before re-fuelling.
  • Ensure that there is adequate ventilation and the vehicle is in a spark free environment
  • Before starting the motor, ensure transmission is in neutral and check the throttle for proper operation.
  • Undertake site safety induction with job supervisor.
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES
Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST