Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Jigsaw Safe Work Method Statement


Jigsaw Safe Work Method Statement

Jigsaw Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Safety Procedure includes :

  • Personal qualifications and experience
  • Preparation
  • Pre-start checks
  • Blade replacement
  • Operation
  • On completion
  • General maintenance
  • Risk ratings
  • 6 page complete procedure
  • MS Word Format
  • Multiple page procedure
  • Available via email within 2 business hours

General Jigsaw Safety Information :

The six page Safe Work Method Statement outlines the safety steps required to operate a Jigsaw safely.

Jigsaws need to be used with caution and appropriate safety procedures. The Jigsaw procedure is not a blank template. Safety procedures can be edited or customised in MS Word if required.

Jigsaw Safety Notes

Before Operating A Jigsaw :

  • Jig saws should always be used with a safety switch.
  • Ensure the work area is clear of debris. Example – previous off cuts have been moved to a safe position.
  • Check the trigger switch and Lock-on button operates correctly and does not stick.
  • Check the blade roller guide is adjusted so that it is in slight contact with the rear of the blade.

References:

 

 

State - Occupational Health and Safety Act.
State - Occupational Health and Safety Regulations.

Bosch Operation / Safety Instruction Manual
Other Jigsaw Operation Manuals.

United States Department of Labor - Occupational Safety & Health Administration – Woodworking eTool - Handheld Jigsaws.


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Circular Saw Safe Work Procedure (Handheld) (CLONE)Circular Saw Safe Work Procedure (Handheld) (CLONE)
Circular Saw Safe Work Procedure (Handheld)
Mitre Saw Safe Work Method StatementMitre Saw Safe Work Method Statement
Mitre Saw Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Power tools, general operation, safety tools, work method statement, safe work procedurePower tools, general operation, safety tools, work method statement, safe work procedure
Power Tools - General Operation