Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Brake Press Work Method Statement


Brake Press Work Method Statement

Brake Press Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Safety Procedure includes:

  • Operators Requirements
  • New Operator Induction
  • Site Awareness
  • Pre-Start Checks
  • Preparation
  • Operation
  • On Completion
  • General Maintenance
  • Risk Ratings
  • MS Word Format
  • This Is Not A Blank Template
  • Multiple page document
  • Delivered via email within 2 business hours

General Air Compressor Safety Information:

Brake Presses need to be used with caution and appropriate safety procedures.

The Brake Press procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.

Brake Press Safety Notes

Before Operating A Brake Press:

  • Check all guards to ensure they are operating and in place.
  • Check emergency stop switches are working.
  • Ensure heavy items are supported.
  • Ensure foot pedal is placed out of the way of material to be bent.
  • Keep hands well clear of blade area.

References:

 

 

Queensland – Department of Industrial Relations - Manufacturing Industry - Sprains and strains prevention fact sheet.
Queensland – Guide to safeguarding common machinery and plant.
New South Wales – WorkCover – Safe operating Procedure – Brake Press (Sample).
South Australia – SafeWork - Metal Fabrication Industry - Machine Guarding Brochure.
SAI Global – AS/NZS 1219-1994 Power Presses – Safety Requirements.
SAI Global - AS4024.1-2006 Safety of machinery.
United States Department of Labor - Occupational Safety & Health Administration - OSHA - Regulations (Standards - 29 CFR) - Mechanical power presses. - 1910.217.


Price: $79.95 


Quantity:   




Mig Welding Safe Work Method Statement
Mig Welding Safe Work Method Statement
forklift operation, instructions, fork lift safety, forklift safety, operating procedure, work method statement
Forklift - LPG SWP
Cut-Off Metal Saw Safe Work Method Statement
Cut-Off Metal Saw Safe Work Method Statement
Guillotine Use Safe Work Method Statement
Guillotine Use Safe Work Method Statement