The Safety Procedure includes:
- Travelling To Job Site
- Pre-start Checks
- Elevating Boom Lift
- Working From Boom Lift
- Securing Boom Lift
- Emergency Procedures
- Risk Ratings
- MS Word Format
- This Is Not A Blank Template
- Multiple page procedure
- Delivered via email within 2 business hours
General Boom Lift Safety Information:
Boom Lift's need to be used with caution and appropriate safety procedures.
The Boom Lift procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.
When Operating A Boom Lift:
- Never use malfunctioning or damaged equipment.
- Ensure to look in all directions when elevating boom lift.
- Do not use boom lift as a crane or lifting device, do no overload the platform.
- Never use ladders, scaffolding, or other objects to gain extra height on the platform.
- Keep the equipment secured to prevent unauthorized use.