Demolition Safe Work Procedure


Demolition Safe Work Procedure

Demolition Safe Work Procedure

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Safety Procedure includes:

  • Risk Assessments
  • Pre-Planning
  • Site Safety
  • Fall Protection
  • Chutes
  • Lift Boxes
  • Removing Glass
  • First Aid
  • Adjoining Buildings
  • Asbestos removal
  • Task Sequences
  • Site Clean Up and more
  • Risk Ratings
  • MS Word Format
  • This Is Not A Blank Template
  • Multiple page procedure
  • Delivered via email within 2 business hours

Site Safety & Security

  • Warning signs will be erected and checked each day.
          Example “Warning Demolition Work in Progress”.
  • Traffic control, road closures and pedestrian controls will be provided as identified and where required.
  • Perimeter hoarding fencing will be installed as required.
  • Gates will be locked at completion of the work day.

General Demolition Safety Information:

Demolition Work can be extremely dangerous and this Safe Work Procedure or Work Method Statement is a vital part of a safe work system.

Safety Culture procedures are Not Blank Templates. Safety Procedures can be edited or customised in MS Word if required.

Demolition Work Safety Notes

Before Commencing Demolition Work:

Ensure:
   Development approval has been granted.
   Approval has been granted from the owner to proceed.
   Building owner has provided a building report of any contained asbestos materials
Review:
   Existing plans (if available) to identify structural systems. If plans are not available consult with a structural engineer.
   Identify the plant and equipment to be used.
Identify:
   Safe means of access and egress to the site and for adjoining buildings and areas such as common use parks.
   Any possible environmental impacts from the demolition.

References:

 

 

National Occupational Health and Safety Commission (Now Australian Safety and Compensation Council) National Standard for Construction Work
Queensland – Workplace Health and Safety Regulations 1997
QueenslandDepartment of Employment and Industrial Relations – Information Paper - Approved criteria for a certificate to perform the prescribed activity of demolition work (Information Paper D1)
Victoria – WorkCover Authority – Code of Practice – No 14 - Demolition
SAI Global – AS/NZS 2601-2001 – Demolition of Structures


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Power tools, general operation, safety tools, work method statement, safe work procedurePower tools, general operation, safety tools, work method statement, safe work procedure
Power Tools - General Operation
Ladders Safe Work Method StatementLadders Safe Work Method Statement
Ladders Safe Work Procedure