Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Dozer Operations Safe Work Method Statement


Dozer Operations Safe Work Method Statement

Dozer Operations Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Operators Requirements
  • Transportation
  • Job Preparation
  • Site Preparation
  • Pre Operational Checks
  • Operation
  • On Completion
  • References
  • Microsoft Word Format
  • Easy to add site specific details and risks
  • Multiple page procedure
  • Available via email within 2 business hours

General Dozer Operations Safety Information:

The Dozer Operations Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for operating a Bulldozer for general earthworks.

The Dozer procedure is Not A Blank Template. Simply add your company details and add any site-specific details or risks.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Dozer procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

When Operating A Dozer:

  • Ensure the immediate area is kept clean of all non-essential personnel
  • Always wear a seat belt
  • Always travel up and down slopes at slow speeds
  • Ensure the key is removed when left unattended
  • When finished, inspect the work area and ensure all wastes and materials have been removed

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Large Excavators Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.Large Excavators Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.
Large Excavators Safe Work Procedure or Work Method Statement
Tip Trucks Safe Work Method StatementTip Trucks Safe Work Method Statement
Tip Trucks Safe Work Method Statement
Earth Moving Equipment Maintenance Work Method Statement or Safe Work ProcedureEarth Moving Equipment Maintenance Work Method Statement or Safe Work Procedure
Earth Moving Equipment Maintenance Work Method Statement or Safe Work Procedure
Motor Grader Operation Work Method StatementMotor Grader Operation Work Method Statement
Motor Grader Operation Work Method Statement