The Safety Procedure includes:
- Risk Assessment
- Operators Requirements
- Inspecting The Area
- Pre Start Checks
- Selecting Drill Speed
- Securing Work
- Drilling
- Switching Machine Off
- General Maintenance
- Risk Ratings
- MS Word Format
- Multiple page procedure
- Available via email within 2 business hours
General Drill Press Safety Information:
The Safe Work Method Statement outlines the Safety Steps required to operate a Drill Press Safely.
Drill Presses need to be used with caution and appropriate safety procedures. The Drill Press procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.
Drill Press Safety Notes
Before Operating A Drill Press:
- No person is to use the drill press, unless trained to do so.
- Ensure the work area is clear.
- Do not use the equipment if there are any faults.
- Check that all guards are in place.
- Inspect drill bit for notches, cracks or bends and replace if necessary.
- Always place the item being drilled in a vice and tighten.
|
References:
|
|
|
|
Victoria - Occupational Health and Safety Act 2004
Victoria - Occupational Health and Safety Regulations 2007
|