Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Dust Extractor Safe Work Method Statement


Dust Extractor Safe Work Method Statement

Dust Extractor Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Safety Procedure includes:

  • Risk Assessment
  • Operators Requirements
  • Site Awareness
  • Operation
  • Emergency Procedures
  • Risk Ratings
  • MS Word Format
  • Delivered via email within 2 business hours
  • Multiple page procedure

General Dust Extractor Safety Information:

The Safe Work Method Statement outlines the Safety Steps required to operate a Dust Extractor Safely.

Dust Extractors need to be used with caution and appropriate safety procedures. The Dust Extractor procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.

Dust Extractor Safety Notes

Before Operating A Dust Extractor:

  • No person shall service the dust extractor, unless trained to do so.
  • Some dry timbers can self-ignite.
  • Have a Class A fire extinguisher on standby.
  • Do not eat, drink or smoke around the equipment.
  • Lock-Off the extraction equipment.
  • If conditions are unsafe, evacuate to at least 50 meters.

References:

 

 

Victoria - Occupational Health and Safety Act 2004
Victoria - Occupational Health and Safety Regulations 2007
Victorian WorkCover Authority - Guidance Note - Wood dust - Health hazards and control
Australian / New Zealand Standard AS/NZS 1715:1994 - Selection, use and maintenance of respiratory protective devices
United Kingdom - Control of Substances Hazardous to Health Regulations (COSHH) - Control guidance sheet 204 - Removing waste from a dust extraction unit


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Mitre Saw Safe Work Method StatementMitre Saw Safe Work Method Statement
Mitre Saw Safe Work Method Statement
Circular Saw Safe Work Procedure (Handheld) (CLONE)Circular Saw Safe Work Procedure (Handheld) (CLONE)
Circular Saw Safe Work Procedure (Handheld)
Power tools, general operation, safety tools, work method statement, safe work procedurePower tools, general operation, safety tools, work method statement, safe work procedure
Power Tools - General Operation