Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Forklift Truck ñ Electric (Non pedestrian) Work Method Statement


Forklift Truck ñ Electric (Non pedestrian) Work Method Statement

Forklift Truck ñ Electric (Non pedestrian) Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Safety Procedure includes:

  • Operators Requirements
  • Site Awareness
  • Preparation
  • Pre Start Daily Checks
  • Entering and Seating
  • Operation
  • Operation On Roads
  • Battery Charging
  • On Completion
  • General Maintenance
  • Risk Ratings
  • MS Word Format
  • Delivered via email within 2 business hours
  • Multiple page document

General Electric Forklift Safety Information:

The Safe Work Method Statement outlines the Safety Steps required to operate an Electric Forklift Safely.

Electric Forklift needs to be used with caution and appropriate safety procedures. The Electric Forklift procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.

Electric Forklift Safety Notes

Before Operating An Electric Forklift:

  • The work area is to be inspected to identify hazards and appropriate prevention/control measures are to be implemented.
  • Forklifts, by their design, limit the operator’s vision. This must be taken into account when traffic movements are considered.
  • Do not hold the steering wheel or levers when mounting or dismounting.
  • Ensure the material is shifted using appropriate equipment such as drum lifters.

References:

 

 

Queensland – Workplace Health and Safety Regulations 1997 – Schedule 5 – Prescribed Occupations – Part 4 – Forklift Operations
QueenslandDepartment of Industrial Relations – Unit of Competency – OHSCER207A
New South Wales – Occupational Health and Safety Regulations 2001
Victoria - Occupational Health and Safety Regulations 2007
Australian Capital Territory – Work Cover – A guide to forklift safety


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
forklift operation, instructions, fork lift safety, forklift safety, operating procedure, work method statementforklift operation, instructions, fork lift safety, forklift safety, operating procedure, work method statement
Forklift - Petrol/Diesel Safe Work Procedure
Job Safety Analysis WorksheetJob Safety Analysis Worksheet
Job Safety Analysis Worksheet
Pallet Jack Safe Work Method StatementPallet Jack Safe Work Method Statement
Pallet Jack Safe Work Method Statement