Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Gantry Crane Safe Work Method Statement


Gantry Crane Safe Work Method Statement

Gantry Crane Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Gantry Crane Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure. This SWMS covers risks and hazards associated with the use of a Gantry Crane. 

The Gantry Crane Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Gantry Crane Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Gantry Crane SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Set up & Pre-operational Checks
  • Planning Lift
  • Operation
  • On Completion
  • Maintenance
  • References

Product Details:
  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Planning:

Ensure correct crane selected:
  • type, size, weight of loads
  • frequency of use
  • layout of workplace (Dangerous goods stores, offices etc)
  • separation from plant/workers (establish exclusion zones)
  • minimum clearances met (1.8m above working mezzanines)
  • lighting
  • unobstructed view of loads

Include safety features:
  • anti-collision (if more than 1 crane operating on same runway)
  • deceleration (limit switches and 2-stage deceleration)
  • load limiting 
  • service platforms (appropriate stairs, handrails etc)
  • covered electrical components
  • SWL (safe work load) displayed

Select suitable lifting gear:
  • for required WLL (work load limit)
  • nature of loads
  • potential for damage (to load or lifting gear)

Note: Do not use fibre rope for lifting gear.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




forklift operation, instructions, fork lift safety, forklift safety, operating procedure, work method statementforklift operation, instructions, fork lift safety, forklift safety, operating procedure, work method statement
Forklift - LPG SWP
Trucks - Loading and Unloading General GuidelinesTrucks - Loading and Unloading General Guidelines
Trucks - Loading and Unloading General Guidelines
Cherry Picker (Elevated Work Platform) Safe Work Method StatementCherry Picker (Elevated Work Platform) Safe Work Method Statement
Cherry Picker (Elevated Work Platform) Safe Work Method Statement
forklift operation, instructions, fork lift safety, forklift safety, operating procedure, work method statementforklift operation, instructions, fork lift safety, forklift safety, operating procedure, work method statement
Forklift - Petrol/Diesel Safe Work Procedure