The Safety Procedure includes :
- Personal qualifications and experience
- Transporting
- Storage
- Planning
- Site safety
- Preparation
- Installation checks
- Breakage
- On completion
- Risk ratings
- 6 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Multiple page document
- Delivered via email within 2 business hours
General Glass Handling Safety Information :
The six page Safe Work Procedure outlines the Safety Steps required to Handle Glass Safely.
This
Procedure or Work Method Statement has been developed for employers to
be able to give direct instructions on how to Handle Glass Safely.
The document can be used as part of an Induction Process, submitted with a tender or simply implemented into your existing OHS System.
Additional Safety Information for Handling Glass
When Handling Glass :
- Glass should not be unloaded on sloping ground where the safe lean on the load is reduced.
- When Storing Glass, it should be kept in upright crates or on a 90º A-Frame
- Always plan safe means of access for employees and materials.
- Ensure the work area is safe before unpacking crates or sheets of glass.
- Check glass for any imperfections or damage prior to moving or carrying it.
|
References:
|
|
|
|
Local State - Occupational Health and Safety Act and Regulations.
New South Wales – WorkCover Safety Alert – Storage and Handling of Glass Sheets.
Western Australia – WorkSafe - Safety and health alert 13/94 Fatal accident - glass handling.
Victoria – WorkCover – Guidance Note - Balustrade Installation - Glass Breakage.
National Training Information Service – LMFGG3003A: Move block/bulk glass sheet by mechanical means.
United Kingdom – Health and Safety Executive / Local Authorities Enforcement Committee (HELA) – Glass Safety Circular.
SAI Global – AS/NZS 2208:1996 Safety Glazing Materials in Buildings.
SAI Global – AS 1288: 2006 Glass in Buildings - Selection and Installation.
|