Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Guillotine Use Safe Work Method Statement


Guillotine Use Safe Work Method Statement

Guillotine Use Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Guillotine - metal cutting Safety Procedure includes :

  • PPE
  • Safety notes
  • Planning
  • Pre-operational checks
  • Operation
  • Clean up
  • Emergency procedures and maintenance
  • References
  • 5 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Guillotine- metal cutting Safety Information :

The Guillotine Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the safety steps for cutting metal with a Guillotine.

The Guillotine procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Guillotine procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Pre-operational checks

Inspect guillotine. Ensure :

  • Power cord undamaged/good condition.
  • No trip hazards present in work area.
  • Moving parts are lubricated and free of dirt/rust.
  • Feed table clear of debris.
  • Guards in place, undamaged (include any motor or fly wheels covers).
  • Emergency stop functional.
  • Area clear of other persons.
  • Controls labelled and working correctly.
  • Cutting table is free of scraps and tools.
  • Foot pedal is guarded to prevent accidental activation.

If missing or damaged parts, do not use. Report and tag out.

Ensure :

  • Rings, bracelets, watches etc are removed.
  • Long hair is tied back.
  • No loose clothing or gloves are worn during cutting.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Grinder Safe Work Method Statementgrinding safety, hand grinder, Work Method Statement,
Grinder Safe Work Method Statement
Mig Welding Safe Work Method StatementMig Welding Safe Work Method Statement
Mig Welding Safe Work Method Statement
Brake Press Work Method StatementBrake Press Work Method Statement
Brake Press Work Method Statement
Power tools, general operation, safety tools, work method statement, safe work procedurePower tools, general operation, safety tools, work method statement, safe work procedure
Power Tools - General Operation