Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Hairdressing Safe Work Method Statement


Hairdressing Safe Work Method Statement

Hairdressing Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Safety Procedure includes :

  • Personal protective equipment (PPE)
  • Safety notes
  • Planning
  • Set up
  • Mixing chemicals
  • Operation- appointments, cutting/styling, storage/stock retrieval
  • Clean up
  • Security
  • Emergency procedures
  • References
  • Risk ratings
  • 7 page complete procedure
  • MS Word Format
  • Easy to add site details and risks
  • Delivered via email within 2 business hours
  • Multiple page document

General Hairdressing Safety Information :

The Hairdressing Safe Work Method Statement is a 7 page comprehensive Safety Procedure covering the steps involved in hairdressing.

It outlines the common risk and hazards encountered in hairdressing and how to counter those risks.

When Hairdressing Always :

  • Ensure there are adjustable seats, adequate lighting and trolleys provided for equipment.
  • Ensure there is PPE available and suitable for the task.
  • To use chemicals before use by date.
  • There are no tripping hazards.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Installing Roof Insulation Batts Safe Work Method StatementInstalling Roof Insulation Batts Safe Work Method Statement
Installing Roof Insulation Batts Safe Work Method Statement
Incident Report FormIncident Report Form
Incident Report Form
Grinder Safe Work Method Statementgrinding safety, hand grinder, Work Method Statement,
Grinder Safe Work Method Statement
Glass Handling Safe Work Method StatementGlass Handling Safe Work Method Statement
Glass Handling Safe Work Method Statement