Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Hedge Trimmer Work Method Statement


Hedge Trimmer Work Method Statement

Hedge Trimmer Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Safety Procedure includes :

  • Operators requirements
  • Transporting
  • Planning
  • Site awareness
  • Preparation fueling
  • Pre-start daily checks
  • Operation
  • On completion
  • General maintenance
  • Risk ratings
  • 5 Page complete procedure
  • MS Word Format
  • Delivered via email within 2 business hours

General Hedge Trimmer Safety Information :

The five-page Safe Work Method Statement outlines the safety steps required to operate a Hedge Trimmer safely.

Hedge Trimmer needs to be used with caution and appropriate safety procedures. The Hedge Trimmer Procedure is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Hedge Trimmer Safety Notes

When Operating a Hedge Trimmer :

  • Before transporting ensure that: the engine has been shut off, the scabbard has been fitted over the blades, and the trimmer is carried by its front handle.
  • Identify any work that might require cutting above shoulder height. This work should be kept minimal.
  • When refuelling, the trimmer should be placed in a flat clear area, and ensure there are no naked flames.
  • Perform a thorough pre-operational check daily.
  • Take particular care when cutting hedges adjacent to wire fences.  DO NOT touch the wire with the cutting blades.

References:

 

 

University of Minnesota – Hedge Trimmer Safety Paper.
Stihl – Hedge Trimmer Safety Manual.


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   

Lawn Edger Safe Work Method Statement
Lawn Edger Safe Work Method Statement
Lawn Mower - Walk Behind Safe Work Method Statement
Lawn Mower - Walk Behind Safe Work Method Statement
Ride On Mower Front Deck Safe Work Procedure (CLONE)
Ride On Mower Front Deck Safe Work Procedure
Ride On Mower Mid Deck Safe Work Procedure
Ride On Mower Mid Deck Safe Work Procedure




Brush cutter, safe work procedure, safety, safe guide, garden tool safetyBrush cutter, safe work procedure, safety, safe guide, garden tool safety
Brush Cutter Safe Work Procedure
Lawn Mower - Walk Behind Safe Work Method StatementLawn mower safety, mower safety, ohs mower, oh&S mower, occupational health and safety mowing, HSE, Safe work procedure, work method statement, standard operating procedure
Lawn Mower - Walk Behind Safe Work Method Statement
chainsaw, chain saw, safety, safe use, personal protective equipment chainsaw,chainsaw, chain saw, safety, safe use, personal protective equipment chainsaw,
Chainsaw - Safe Work Procedure
Weed Control Safe Work Method StatementWeed Control - Spraying Herbicide
Weed Control Safe Work Method Statement