Hiab Truck Loader Crane


Hiab Truck Loader Crane

Hiab Truck Loader Crane Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Safety Procedure includes :

  • Risk assessment
  • Entering construction sites
  • Pre-start checks
  • Overhead wires
  • Stabilisers
  • Crane operation
  • On completion
  • Maintenance
  • Risk ratings
  • 3 page complete procedure
  • MS Word Format
  • Delivered via Email within 2 business hours

General Hiab Crane Safety Information :

Hiab Cranes are now found being used on most construction sites and in many other industries. Loading and unloading with a Hiab Crane can be performed safely, provided Safe Work Procedures are followed.

The Hiab Crane Safety Procedure is not a blank template. Safety procedures can be edited or customised in MS Word if required.

Hiab Crane Safety Information

Hiab General Operation :

  • Operator should be positioned on the opposite side of the truck to that which the load will be lifted or lowered.
  • Operator should have a clear view of the area where the load will be lifted from or lowered onto.

Ensure :

  • That loads will not become snagged which may cause equipment failure. This may require an observer or guide ropes to be attached. Example Loading/unloading pipes.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Trucks- Loading and Unloading Work Method StatementTrucks - Loading and Unloading General Guidelines
Trucks- Loading and Unloading Work Method Statement
Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
Large Excavators Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.Large Excavators Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.
Large Excavators Safe Work Procedure or Work Method Statement