Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Jackhammer- petrol Safe Work Method Statement
Jackhammer- petrol Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Jackhammer- petrol Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure.  This SWMS covers the use of a petrol-powered Jackhammer.

The Petrol Jackhammer Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Jackhammer- petrol Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Jackhammer- petrol SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Pre-operational Inspection:

  • Conduct visual inspection. Ensure:
  • Throttle trigger moves freely and springs back to idle
  • Drill bit correct for job, secure with no missing/loose nuts, screws
  • Drill bit / chuck not cracked, bent, or warped
  • Muffler shell undamaged
  • Handle/grips undamaged and free of oil/dirt
  • Guards in place and undamaged
  • Unit clean and free of dust/dirt etc
  • No fuel leaks
  • Anti-vibration (AV) system in place
  • Fuel stored in suitable containers

PPE:

Earmuffs:
  • No hardness, cracks on ear-cups
  • Replace cushions after 6-8 months. If used in extreme climates – replace after 3-4 months.
  • Respiratory Protection:
  • Suitable for contaminant
  • Proper fit (no facial hair, fit for individual)
  • Worn correctly
  • All pieces inspected, no damage

Gloves:
  • Vibration-insulation
  • Safety Glasses
  • Side protection panels in place
  • Clean and free of cracks or visibility obstructions

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Grinder Safe Work Method Statementgrinding safety, hand grinder, Work Method Statement,
Grinder Safe Work Method Statement
Power tools, general operation, safety tools, work method statement, safe work procedurePower tools, general operation, safety tools, work method statement, safe work procedure
Power Tools - General Operation
Concrete Sawing Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.Concrete Sawing Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.
Concrete Sawing Safe Work Procedure or Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement