Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Lawn Edger Safe Work Method Statement


Lawn Edger Safe Work Method Statement

Lawn Edger Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Lawn Edger Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure. This SWMS covers general safety aspects associated with the use of an electric or fuel operated Lawn-edger.

The Lawn Edger Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Lawn Edger Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Lawn Edger SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Refueling
  • Cleaning & Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 10 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

    Operation:

    Operate as per manufacturer's instructions. Example:
    • Adjust blade depth to minimum required for job.
    • Place unit on firm ground, clear of obstacles.
    • Adjust handles to comfortable position
    • Ensure all body parts clear of cutting head
    • Establish firm footing and balance
    • Stand to left side of main handle
    • Line up with pavers (or area as needed)
    • Tilt handle down to raise blade
    • Turn on and allow blade to spin
    • Without moving forward, place blade onto surface by slowly lowering into position
    • Move forward slowly
    • Forward direction only

    Ensure other persons remain at least 5m from operator. Immediately shut off if approached.

    Hold unit with two hands, move slowly during first pass, faster pace can be used for 2nd/3rd runs as required.

    Work moving away from solid objects such as walls, steps etc. These areas may need to be done by hand

    Check cutting head is secure and blades are not damaged at regular intervals. Periodically check that all fixings are tight and have not become loose from vibration

    Remain alert, be cautious of hidden obstacles.

    Price: $79.95 


    This product qualifies for quantity discount pricing.

    (what's this?)


    Quantity:   




    Lawn Mower - Walk Behind Safe Work Method StatementLawn mower safety, mower safety, ohs mower, oh&S mower, occupational health and safety mowing, HSE, Safe work procedure, work method statement, standard operating procedure
    Lawn Mower - Walk Behind Safe Work Method Statement
    Brush cutter, safe work procedure, safety, safe guide, garden tool safetyBrush cutter, safe work procedure, safety, safe guide, garden tool safety
    Brush Cutter Safe Work Procedure
    Hedge Trimmer Work Method StatementHedge Trimmer Work Method Statement
    Hedge Trimmer Work Method Statement
    Weed Control Safe Work Method StatementWeed Control - Spraying Herbicide
    Weed Control Safe Work Method Statement