Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Lawn Mower - Walk Behind Safe Work Method Statement


Lawn Mower - Walk Behind Safe Work Method Statement

Lawn Mower - Walk Behind Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Cylinder Lawn Mower (walk behind)  Safe Work Method Statement (SWMS) is a comprehensive 7page procedure outlining the safety steps for operation of a walk behind Cylinder Lawn Mower

The Cylinder Lawn Mower (walk behind) procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Cylinder Lawn Mower (walk behind), procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Cylinder Lawn Mower (walk behind), Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre operational checks
  • Operation
  • Refueling
  • Maintenance
  • Emergency Procedures

Product Details:
  • 7 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Conduct visual inspection. Ensure:
  • throttle moves freely stays in place as required
  • cutting blades secure with no missing/loose nuts, screws
  • blades are not cracked, bent, or warped
  • muffler shell undamaged
  • handle/grips undamaged and free of oil/dirt
  • blade guards in place and undamaged
  • fasteners in place and secure
  • grass catcher or rear flap in place and secured
  • unit clean and free of vegetation (no build up of grass around engine and muffler)
  • no fuel leaks
  • Safety switch present for electric model

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Brush cutter, safe work procedure, safety, safe guide, garden tool safetyBrush cutter, safe work procedure, safety, safe guide, garden tool safety
Brush Cutter Safe Work Procedure
Hedge Trimmer Work Method StatementHedge Trimmer Work Method Statement
Hedge Trimmer Work Method Statement
Weed Control Safe Work Method StatementWeed Control - Spraying Herbicide
Weed Control Safe Work Method Statement
Lawn Edger Safe Work Method StatementSafe Work Procedure, Work Method Statement, Standard Operating Procedure, Lawn edger, garden maintence, gardener safety
Lawn Edger Safe Work Method Statement