Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Meat Slicer Safe Work Method Statement


Meat Slicer Safe Work Method Statement

Meat Slicer Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Meat Slicer Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure. This SWMS covers the use of a Meat Slicer for slicing meats and cheeses.

The Meat Slicer Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Meat Slicer Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Meat Slicer SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational inspection
  • Operation
  • Cleaning & Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 9 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Operation:

Ensure slicer is cleaned and sanitized as required for food preparation legislation (Example: Every 4 hours of use at room temperature).

Ensure floor area clean and free of slip, trip hazards. Ensure steady balance and firm footing.

Follow manufacturer's instruction for use. Example:
Place suitable meat/cheese into position
Secure item so it will not shift by using push guard
Push product carriage forward and backward over blade using push handle or knob
Keep clear of slicer (including handle) when in automatic slicer mode.
Turn off and adjust thickness regulator to zero before collecting /removing meat that has been sliced.

Do not work in static postures for 30 minutes at a time, or 2 hours over entire shift. Consider job rotation for long duration slicing tasks.

Keep hands/body parts clear of rotating blades. Do not reach across blade. Always use push guard when slicing.

Turn off whenever leaving slicer (even for a moment).

Ensure full attention when slicing. If interrupted, stop slicing, turn machine off.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Knives -safe use Safe Work Method StatementKnife safety, knives at work, kitchen knife procedure, safe work procedure, work method statement
Knives -safe use Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Lawn Edger Safe Work Method StatementSafe Work Procedure, Work Method Statement, Standard Operating Procedure, Lawn edger, garden maintence, gardener safety
Lawn Edger Safe Work Method Statement
Metal Turning Lathe Safe Work Method StatementMetal Turning Lathe Safe Work Method Statement
Metal Turning Lathe Safe Work Method Statement