Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Metal Turning Lathe Safe Work Method Statement


Metal Turning Lathe Safe Work Method Statement

Metal Turning Lathe Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Metal Turning Lathe Safety Procedure includes :

  • PPE
  • Safety Notes
  • Personnel
  • Risk Assessment
  • Pre-start checks
  • Set Up
  • Special Notes
  • Completion
  • Clean Up
  • References
  • 6 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

 

Metal Turning Lathe Safe Work Method Statement :

The Metal Turning Lathe Safe Work Method Statement (SWMS) is a comprehensive 6 page procedure outlining the safety steps for using a Metal Turning Lathe.

The Metal Turning Lathe procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Metal Turning Lathe procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

General Metal Turning Lathe Safety Information :

Metal Turning Lathe Safety Notes

Before Operating A Metal Turning Lathe :

  • Always keep work area clear of any obstacles on the floor.
  • Set the tool bar assembly to the correct height.
  • Switch on the machine.
  • Position the coolant nozzle over the work.
  • Ensure tool bar has sufficient clearance away from the spinning chuck.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Grinder Safe Work Method Statementgrinding safety, hand grinder, Work Method Statement,
Grinder Safe Work Method Statement
Drill Press Safe Work Method StatementDrill Press Safe Work Method Statement
Drill Press Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Pedestal Drill Safe Work Method StatementPedestal Drill Safe Work Method Statement
Pedestal Drill Safe Work Method Statement