The Safety Procedure includes :
- Operators requirements
- Significant risks
- Site awareness
- Transporting
- Conduct routine checks
- Access
- Seat adjustment
- Starting
- Operating
- Site safety
- Completion
- Refueling
- General maintenance
- Risk ratings
- 8 Page Complete Procedure
- MS Word Format
- Multiple page document
- Delivered via email within 2 business hours
General Motor Grader Safety Information :
The eight page Safe Work Method Statement outlines the Safety Steps required to operate a Motor Grader Safely.
Motor Grader needs to be used with caution and appropriate safety procedures. The Motor Grader procedure is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Motor Grader Operation Safety Notes
Before Operating A Motor Grader:
- Where required the site should be barricaded off to ensure the public is not placed in harms way.
- The grader must be operated in accordance with statutory regulations at all times (e.g. while being driven on roads).
- Check for visual evidence of structural weaknesses such as paint separation and/or weld stress.
- Ensure the seat is locked in position and cannot rotate unless released by the operator.
|
References:
|
|
|
|
Queensland – Workplace Health and Safety Regulations 1997.
Queensland – Department of Industrial Relations – Operate a grader – Units of Competency - Code OHSCER217A.
West Australia – Worksafe - Safety and Health Alert – Worker killed by reversing grader.
Victoria - WorkSafe – Construction and Utilities Program Incident Report – Grader Collision with Train at Level Crossing.
|