Painting (General Requirements) Safe Work Method Statement


Painting (General Requirements) Safe Work Method Statement

Painting (General Requirements) Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Painting Safety Procedure includes :

  • PPE
  • Safety notes
  • Planning
  • Preparation
  • Storage and transit
  • Mixing
  • Operation
  • Clean up
  • References
  • 7 Page complete procedure
  • MS Word Format
  • Add site specific details and risks
  • Make it task specific

General Painting Safety Information :

The Painting Safe Work Method Statement (SWMS) is a comprehensive 7 page procedure outlining the safety steps for general Painting. It does not include paint stripping/removal or spray painting.

The Painting procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Painting procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Storage and Transit

Keep quantities to a minimum wherever possible.

Ensure adequate ventilation and spill containment.

Ensure no ignition sources in area.

Note : Ignition sources include pilot lights, stoves, heaters, cigarettes, matches/lighters, grinding, welding, power points, lighting, light switches, radio transmitters, mobile phones, battery powered forklifts etc.

Keep all containers labeled and closed when not in use.

Provide facilities for disposal of rags etc.

Keep paints outside of main vehicle cabin if possible. Secure so paints cannot move/become damaged/spill during transit.

References:

 

 

OHS Legislation in all States

WorkSafe Victoria Bulletin (2008) Transporting small quantities of dangerous goods - Tools of trade

Wor kcover NSW (2004) Media releases - Painting firm fined $50,700 after fall from roof.

Work Safe Victoria Code of Practice Ð Storage and Handling of Dangerous Goods

Work Safe Victoria Code of Practice Ð Manual Handling

AS/NZS 2340 Ð Classification of Hazardous Areas

AS 2381.1 Ð Electrical equipment for Explosive Atmospheres

AS1940 Ð 1994 Storage and Handling of Flammable and Combustible Liquids

Work Safe Victoria Ð Prevention of falls in General Construction (2006)


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   

trestle safety, work method statement trestle, testle safe work procedure
Trestle Safe Work Procedure
Heights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
scaffolding safety, safe work procedure work method statement
Scaffolding Safe Work Procedure
 




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
Power tools, general operation, safety tools, work method statement, safe work procedurePower tools, general operation, safety tools, work method statement, safe work procedure
Power Tools - General Operation
Job Safety Analysis WorksheetJob Safety Analysis Worksheet
Job Safety Analysis Worksheet