Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Ride on Drum Roller Safe Work Method Statement


Ride on Drum Roller Safe Work Method Statement

Ride on Drum Roller Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Ride on Drum Roller Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure that covers  general operation of a Ride on Drum Roller. There are several types of ride on drum rollers and attachments (such as scraper/spray bars, padfoot drums, drag booms, rock crushing, etc). 

The Ride on Drum Roller Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Ride on Drum Roller Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Ride on Drum Roller SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Set up & Pre-operational Checks
  • Transport to & from Site
  • Operation
  • On Completion
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 8 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:


Operation:

Follow manufacturer's instructions (including acceptable slope ranges)

Wear seatbelt

Ensure only operator rides on equipment (no passengers)

Follow traffic management plan (including speed limits, traffic flow, traffic controller instructions).

When operated on slopes:
  • Never cross a slope, always travel up or down a slope.
  • Do not attempt to change gears when travelling on slopes 
  • Attachments:
  • Ensure correct for task
  • Secure as per manufacturer's instructions
  • Test to ensure correct fit/secured

Re-fueling:
  • Do not smoke when refueling
  • Ensure no ignition sources

Ensure adequate ventilation in refueling area.


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Large Excavators Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.Large Excavators Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.
Large Excavators Safe Work Procedure or Work Method Statement
Tip Trucks Safe Work Method StatementTip Trucks Safe Work Method Statement
Tip Trucks Safe Work Method Statement
Motor Grader Operation Work Method StatementMotor Grader Operation Work Method Statement
Motor Grader Operation Work Method Statement
Bobcat loader, skid steer work method statement, safe work procedure, standard operating procedureBobcat loader, skid steer work method statement, safe work procedure, standard operating procedure
Bobcat - Skidsteer SWP