Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Sandblasting Safe Work Method Statement


Sandblasting Safe Work Method Statement

Sandblasting Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Sandblasting Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the safety steps for using Dry Air Powered Abrasive Blasting (Sandblasting) equipment. This SWMS outlines prohibited blasting media which includes silica sand, river, beach or other white sands (containing more than 1-2% crystalline silica). 

The Sandblasting procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Sandblasting procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Sandblasting Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Set-Up Cabinet
  • Set-Up Chamber
  • Set-Up Temporary Enclosures/Exclusion Zone
  • Pre-Operational Checks – Blasting Equipment
  • Pre-Operational Checks – PPE
  • Operation
  • Clean-up and Decontamination
  • Emergency Procedures
  • References

Product Details:
  • 12 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:


Planning:
  • Assess size of object to be blasted
  • For small work pieces – use Blasting cabinet
  • For larger pieces – us Blasting chamber/room
  • For very large pieces (bigger than 2.5m x 2.5m x 3m) provide temporary enclosure and/or exclusion zone

Use suitable blast media:
  • garnet
  • crushed or bead glass
  • metal shot, steel grift
  • aluminium oxide
  • granulated plastics
  • some metal slag (avoid possible toxins such as chromium or lead)

Obtain MSDS (Material Safety Data Sheet) for blasting media, solvents, finishing sprays etc.

Develop task or site specific SWMS

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Safe Work Procedure, work method statement, spray painting safety, wms, swms,Safe Work Procedure, work method statement, spray painting safety, wms, swms,
Spray Painting Outdoors Safe Work Procedure
Safety Harness Safe Work Method Statementsafety harness policy, safety harness procedure, safe harness procedure
Safety Harness Safe Work Method Statement
scaffolding safety, safe work procedure work method statementscaffolding safety, safe work procedure work method statement
Scaffolding Safe Work Procedure
Spray Painting- booth Safe Work Method StatementSpray Painting (Booths) Safe Work Procedure
Spray Painting- booth Safe Work Method Statement