Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Polyethylene Pipe Butt Welding Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.


Polyethylene Pipe Butt Welding Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.

Steel Construction Safe Work Procedure or Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Steel Construction Safety Procedure includes :

  • PPE
  • Safety Notes
  • Personnel
  • Planning
  • Site Assessment
  • Transport
  • Erection
  • Lifting
  • Emergency Procedures
  • References
  • 9 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Steel Construction Safe Work Method Statement:

The Steel Construction Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure outlining the safety steps for Steel Construction. Steel construction involves erection of assembled portions and single components including columns, beams, bracing, rafters etc.

The Steel Construction procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Steel Construction procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.


References:

NSW-    Occupational Health and Safety Act 2000
            Occupational Health and Safety Regulation 2001

QLD-    Workplace Health and Safety Act 1995 (Reprinted 1/1/08)
            Workplace Health and Safety Regulation (Reprinted 1/2/08)
            Steel Construction Code of Practice 2004

ACT-     Occupational Health and Safety Act 1989
            Code of Practice Steel Construction 1997

TAS-     Workplace Health and Safety Act 1995
             Workplace Health and Safety Regulation 1998

NT-       Workplace Health and Safety Act 2007
             Workplace Health and Safety Regulation 2008

SA-       Occupational Health, Safety and Welfare Act 1986
            Occupational Health Safety and Welfare Regulation 1995

WA-      Occupational Safety and Health Act 1984


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Grinder Safe Work Method Statementgrinding safety, hand grinder, Work Method Statement,
Grinder Safe Work Method Statement
Power tools, general operation, safety tools, work method statement, safe work procedurePower tools, general operation, safety tools, work method statement, safe work procedure
Power Tools - General Operation