Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Trench Work Safe Work Procedure


Trench Work Safe Work Procedure

Trench Work Safe Work Procedure

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Trenching Safe Work Method Statement (SWMS) is a comprehensive 18 page procedure.

This SWMS covers general hazards associated with trenching operations. This SMWS should be used in conjunction with SMWS dedicated to Confined Space Entry (as required) and Emergency Response– Trench Collapse. 
 
The Trenching procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Trenching Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Trenching SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 18 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Planning

Obtain information about:
  • Type of soil (moisture content, hardpan, clay, silt, loam, sand, layered, backfill, etc)
  • Rocky outcrops
  • Water sources, creeks, wetlands etc
  • Water table
  • Faults/ bedding planes
  • Surface drainage
  • Slope/ lean of land
  • Underground assets including pipelines
  • Underground tanks (fuel or chemical)
  • Possible contamination
  • Previous excavations in area
  • Proximity to buildings

Seek geotechnical analysis as required.

Notify relevant State Authority as required. Example: If persons are to enter trench, notify 3 days prior to excavation.

Seek qualified persons advice (engineer) if:
  • Trench is more than 6m deep
  • Trench located adjacent to water body
  • Variable ground conditions
  • Complex de-watering required
  • Any trench 1.5m or more that persons will enter 

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Large Excavators Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.Large Excavators Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.
Large Excavators Safe Work Procedure or Work Method Statement
Plumbing Hot & Cold Water Rough In Safe Work Method StatementPlumbing Hot & Cold Water Rough In Safe Work Method Statement
Plumbing Hot & Cold Water Rough In Safe Work Method Statement
working on roofs, safe work, rooves, height safety, construction site safetyworking on roofs, safe work, rooves, height safety, construction site safety
Working On Roofs Above 2m Safe Work Procedure