Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Weed Control Safe Work Method Statement


Weed Control Safe Work Method Statement

Weed Control Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Weed Control Safe Work Method Statement (SWMS) is a comprehensive 14 page procedure.

The effects of herbicides on humans can vary from skin, stomach, eye and lung irritation, to damage to liver, kidneys and nervous system. Symptoms can be mild or severe enough to be fatal and depend on the chemicals used. Main routes of exposure include absorption (skin/eye), inhalation and ingestion (through eating/smoking without washing hands after using).

The Weed Control Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Weed Control Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Weed Control SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Mixing/Decanting
  • Operation
  • Clean Up
  • Emergency Procedures
  • References

Product Details:
  • 14 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Emergency Procedures:


Spills:
  • wear PPE
  • use absorbent materials (such as vermiculite or sand) to restrict spill
  • if spill powder form – apply fine water mist (only if compatible with water) or cover with plastic sheet.
  • Cover entire spill with absorbent material and allow time to absorb.
  • Scoop into container and label as waste.

Follow MSDS advice if exposed to chemicals. If required, take MSDS to Doctor.

Note: Medical surveillance may be required when working with some herbicides. Discuss with Doctor as necessary.

Develop emergency response plan. Include:
  • Communication equipment
  • first aid kits/training/equipment
  • near-by medical facilities
  • evacuations/assembly points


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Brush cutter, safe work procedure, safety, safe guide, garden tool safetyBrush cutter, safe work procedure, safety, safe guide, garden tool safety
Brush Cutter Safe Work Procedure
Fuel Storage, Handling and Decanting Safe Work Method StatementFuel Storage, Handling and Decanting Safe Work Method Statement
Fuel Storage, Handling and Decanting Safe Work Method Statement
chainsaw, chain saw, safety, safe use, personal protective equipment chainsaw,chainsaw, chain saw, safety, safe use, personal protective equipment chainsaw,
Chainsaw - Safe Work Procedure