The Wood Chipper Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure. Wood chippers come in various sizes, designs and applications. This SWMS deals with the main safety principals when operating a wood chipper and specific safe work instructions should be obtained from the manufacturer’s instruction/operating manual.
The Wood Chipper Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Wood Chipper Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Wood Chipper SWMS includes:
Product Details:
Related items:
Preparation:
Prepare intended work site:
Locate vehicle and chipper in suitable location away from edge of road and other obstacles, such as chainsaw operators. Ensure discharge site does not pose risks (lower visibility, tripping hazards).
Ensure operator:
Price: $79.95 |
![]()
|






