Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Knives -safe use Safe Work Method Statement


Knives -safe use Safe Work Method Statement

Knives -safe use Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Knife Safety Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure. This SWMS covers the use of knives (mostly for food-related industries). This does NOT cover the use of box cutters and blades etc, used to remove packaging materials, or to cut through construction materials, etc.

Most injuries occur to the hand not holding the knife. These are usually caused by errors in judgement when cutting, slipping of hands/knives, or incorrect finger-placement.

The Knife Safety Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Knife Safety Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Knife Safety SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 9 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Planning:


Ensure area suitable for use of knives.
  • Sufficient room for cutting tasks
  • Left and right-handers are separated to prevent knocking
  • Floors clean, free of obstacles or tripping hazards
  • Tables, benches are at suitable height and placed on firm surface – no rocking/movement
  • Workspaces are clear of stored items, uneven surfaces and clean free of clutter, spills etc
  • Lighting is suitable:
    • Sufficient Lux (illumination)
    • No shadows on workspace
    • No glare on reflective surfaces
  • First Aid Kit stocked
  • First Aid trained persons in attendance
  • Suitable storage facility (such as scabbards)

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Meat Slicer Safe Work Method StatementMeat Slicer Safe Work Method Statement
Meat Slicer Safe Work Method Statement
Power Tools Safe Work Method StatementPower Tools Safe Work Method Statement
Power Tools
Lawn Edger Safe Work Method StatementSafe Work Procedure, Work Method Statement, Standard Operating Procedure, Lawn edger, garden maintence, gardener safety
Lawn Edger Safe Work Method Statement