Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Graffiti Removal


Graffiti Removal

Graffiti Removal Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

Graffiti Removal Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • Chemical Spills
  • First Aid
  • Emergency Response
  • References
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Graffiti Removal Safe Work Method Statement:

The Graffiti Removal Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the removal of graffiti from different surfaces including: aluminium, glass, masonry, metal, foot paths, street signs and timber.

The Removal of Graffiti procedure is ready to use and is not a blank template. Simply add your company details, ABN number, and include any site specific details or risks and make it specific to the graffiti you are removing.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Graffiti Removal procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Graffiti Removal Work Method Statement Notes


Planning. Assess the intended work site for risks. Ensure:

  • Sufficient room to undertake task
  • Adequate lighting
  • Traffic Management put in place where required (bollards, witches hats, caution signs)
  • Suitable weather conditions
  • Ground surface suitable (no fall risks, ladders, if used can be secured and not dislodged by pedestrians etc)
  • First aid and emergency eye wash/water available.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
Painting (General Requirements) Safe Work Method StatementPainting (General Requirements) Safe Work Method Statement
Painting (General Requirements) Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Job Safety Analysis WorksheetJob Safety Analysis Worksheet
Job Safety Analysis Worksheet