Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Concrete Joining, Sealing and Curing Safe Work Method Statement


Concrete Joining, Sealing and Curing Safe Work Method Statement

Concrete Joining, Sealing and Curing Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

Concrete Joining, Sealing and Curing Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • Completion
  • First Aid/Emergency Procedures
  • References
  • 8 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Concrete Joining, Sealing and Curing Safe Work Method Statement:

The Concrete Joining, Sealing and Curing Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure outlining the safety steps for joining, sealing and curing concrete.

The Concrete Joining, Sealing and Curing procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Concrete Joining, Sealing and Curing procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

First Aid/Emergency Procedures :

Follow MSDS for First Aid instructions. If operator exposed, take MSDS with patient to Doctor. Develop and implement an emergency response plan for the site. Include

  • assembly points
  • communication
  • responsible persons
  • emergency contacts (including nearest medical facility)

References :

OHS Legislation in all States

MSDS Selley’s – Wet Area Silicone Sealant (2004)

QC Solvent-based Sealers (Spray-Applied) – QC Construction Products – Information Bulletin (2008)

WorkSafe Victoria – Prevention of falls in General Construction (2006)

WorkSafe Victoria – Code of Practice – Manual Handling

AS/NZS 1716:2003 Respiratory protective device

AS3000 Wiring Rules

AS/NZS 2340 – Classification of Hazardous Areas

AS 2381.1 – Electrical equipment for Explosive Atmospheres

Workcover NSW – Safety Alert – Moving Plant on Construction Sites


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Concrete Preparation and Laying Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.Concrete Preparation and Laying Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.
Concrete Preparation and Laying Safe Work Procedure or Work Method Statement
Concrete Sawing Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.Concrete Sawing Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.
Concrete Sawing Safe Work Procedure or Work Method Statement
Concrete Formwork Work Method StatementConcrete Formwork Work Method Statement
Concrete Formwork Work Method Statement
Concrete Helipcopter Safe Work Method StatementConcrete Helipcopter Safe Work Method Statement
Concrete Helicopter Safe Work Method Statement