Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Concrete Vibrator Safe Work Method Statement


Concrete Vibrator Safe Work Method Statement

Concrete Vibrator Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

Concrete Vibrator Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • Refueling
  • Maintenance
  • Emergency Procedures
  • References
  • 6 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Concrete Vibrator Safe Work Method Statement:

The Concrete Vibrator Safe Work Method Statement (SWMS) is a comprehensive 6 page procedure outlining the safety steps for operating a Petrol Driven Concrete Vibrator.

The Concrete Vibrator procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Concrete Vibrator procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Preparation

Inspect equipment. Ensure:

  • Unit is clean, free of oil, grease, concrete
  • Sufficient oil/petrol
  • No leaks
  • Guards in place and undamaged
  • Controls labelled and working
  • No missing screw/bolts
  • No cracked, broken or missing parts
  • No misalignment or binding of moving parts
  • Lock lever in place on cylindrical connector
  • Hoses/couplings/vibrator head secured adequately
  • Hoses undamaged, free of wear/tear
  • Vibrator head/hose assembly suitable for make/model of unit
  • Operator not fatigued or under influence of drugs/alcohol
  • Hair tied back, no loose clothing or jewellery
  • Operator able to handle vibratory force of unit

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Concrete Preparation and Laying Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.Concrete Preparation and Laying Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.
Concrete Preparation and Laying Safe Work Procedure or Work Method Statement
Concrete Formwork Work Method StatementConcrete Formwork Work Method Statement
Concrete Formwork Work Method Statement
Concrete Helipcopter Safe Work Method StatementConcrete Helipcopter Safe Work Method Statement
Concrete Helicopter Safe Work Method Statement
Concrete Sawing Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.Concrete Sawing Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.
Concrete Sawing Safe Work Procedure or Work Method Statement