Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
High Pressure Cleaner - Petrol Operated Safe Work Method Statement


High Pressure Cleaner - Petrol Operated Safe Work Method Statement

High Pressure Cleaner - Petrol Operated Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

High Pressure Cleaner - Petrol Operated Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation and Set Up
  • Operation
  • Refueling
  • Maintenance
  • References
  • 5 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

High Pressure Cleaner - Petrol Operated Safe Work Method Statement:

The Petrol Operated High Pressure Cleaner Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the safety steps for using a High Pressure Cleaner. This SWMS covers the use of the petrol operated high pressure cleaner with cold water.

If using hot water, read the manufacturer’s instructions for further precautions. The Petrol Operated High Pressure Cleaner procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The High Pressure Cleaner - Petrol Operated procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Refueling :

Shut off unit and allow cooling before refueling. Never refuel while motor running.

Do not smoke and ensure refueling is undertaken in well ventilated area (outside, and clear of ignition sources).

Remove cap slowly.

Fill tank and wipe away excess. Ensure cap replaced securely. Check for leaks.

Move at least 3 m from refueling site before starting unit.


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Job Safety Analysis WorksheetJob Safety Analysis Worksheet
Job Safety Analysis Worksheet
Power tools, general operation, safety tools, work method statement, safe work procedurePower tools, general operation, safety tools, work method statement, safe work procedure
Power Tools - General Operation
Fuel Storage, Handling and Decanting Safe Work Method StatementFuel Storage, Handling and Decanting Safe Work Method Statement
Fuel Storage, Handling and Decanting Safe Work Method Statement