Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Sheet Metal Roller Safe Work Method Statement


Sheet Metal Roller Safe Work Method Statement

Sheet Metal Roller Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

Sheet Metal Roller Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Pre- operational checks
  • Operation
  • Clean up & maintenance
  • Emergency procedures
  • References
  • 5 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Sheet Metal Roller Safe Work Method Statement:

The Sheet Metal Roller Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the safety steps for using a Sheet Metal Roller.

The Sheet Metal Roller procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Sheet Metal Roller procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Clean up & maintenance :

  • Switch off the machine and remove power supply (isolate from power).
  • Clean work area (Use gloves to handle scrap).

Note : Sheet metal edges are sharp.

  • Inspect for damage. If damaged, tag out plant and report immediately.
  • Follow manufacturer’s instructions for regular maintenance and servicing.
  • Ensure any guards removed during maintenance are replaced and secured.

References

OHS Legislation in all States

National Standard for Plant [NOHSC:1010(1994)]

Worksafe Victoria - Code of Practice for Plant

DEIR Queensland – Product Manufacturing Industry – Sheet Metal/Plate Rolling Machines, 2003

Worksafe Victoria – A Guide to Safety in the Metal Fabrication Industry 2007.

Australian Standards 4024-1998 Series – Safeguarding of Machinery


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Safe Work Procedure, work method statement, spray painting safety, wms, swms,Safe Work Procedure, work method statement, spray painting safety, wms, swms,
Spray Painting Outdoors Safe Work Procedure
Brake Press Work Method StatementBrake Press Work Method Statement
Brake Press Work Method Statement
Cut-Off Metal Saw Safe Work Method StatementCut-Off Metal Saw Safe Work Method Statement
Cut-Off Metal Saw Safe Work Method Statement
forklift operation, instructions, fork lift safety, forklift safety, operating procedure, work method statementforklift operation, instructions, fork lift safety, forklift safety, operating procedure, work method statement
Forklift - LPG SWP