Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Air Con Installation Work Method Statement or Safe Work Procedure


Air Con Installation Work Method Statement or Safe Work Procedure

Air Con Installation Work Method Statement or Safe Work Procedure

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

Air Con Installation Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational inspection
  • Installation
  • Emergency Procedures
  • References
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • E-mailed out

Related Items:

  • Air Conditioner Maintenance
  • Manual Handling

Air Con Installation Safe Work Method Statement:

The Air Conditioner Installation Safe Work Method Statement (SWMS) is a comprehensive 6 page procedure outlining the steps for the safe installation of air conditioner units.

This SWMS covers risks associated with the general installation of air conditioning systems. Ensure the manufacturer’s installation manual/guide is available for specific information on all installation works.

The Air Conditioner Installation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Air Conditioner Installation procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Installation Refrigerant Gases:

  • Ensure restrained adequately on transport vehicle.
  • Avoid storing inside cabin of vehicles
  • Keep minimum quantities
  • Ensure Material Safety Data Sheet available (within 5 year issue date)
  • Inspect cylinders regularly to ensure no damage or leaks
  • Ensure adequate ventilation

Air Con Installation Risk Assessment Notes


Ensure system designed by suitably qualified persons. Assess installation site. Check:

  • Anchor points (suitable work load and position)
  • Proximity to power lines
  • Type of roof (pitched, tile, sky lights etc)
  • Condition of roof (fragile, brittle etc)
  • Presence of hazardous materials such as asbestos, lead, silica etc)
  • Load bearing capacity of support walls, ceiling, roof
  • Height of work area
  • Access for equipment and materials
  • Number of persons expected on roof/ceiling space
  • Power supply
  • Location of existing services (heating, water, pipes, electrical leads)
  • Traffic Management requirements

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Air Con Maintenance Work Method Statement or Safe Work ProcedureAir Con Maintenance Work Method Statement or Safe Work Procedure
Air Con Maintenance Work Method Statement or Safe Work Procedure
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Refrigerant Gases Safe Work Procedure Or Work Method StatementRefrigerant Gases Safe Work Procedure Or Work Method Statement
Refrigerant Gases Safe Work Procedure Or Work Method Statement
Ladders Safe Work Method StatementLadders Safe Work Method Statement
Ladders Safe Work Procedure