Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Chain Trencher Work Method Statement or Safe Work Procedure


Chain Trencher Work Method Statement or Safe Work Procedure

Chain Trencher Work Method Statement or Safe Work Procedure

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Chain Trencher Safety Procedure includes:

  • PPE
  • Safety Notes
  • Preparation
  • Pre-inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Chain Trencher Safe Work Method Statement:

The Chain Trencher Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for using a Chain Trencher.

This SWMS concerns backhoe-mounted trenching attachments/trencher booms.

The Chain Trencher procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System.

The Chain Trencher procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Chain Trencher illness can include:

  • fainting
  • heat stroke
  • fatigue/exhaustion
  • rashes (such as prickly heat) or heat cramps
  • worsening of pre-existing medical conditions

Chain Trencher Risk Assessment Notes


Preparation:

  • Assemble trenching attachment onto backhoe as per manufacturer’s instructions.

Check that trencher is attached correctly:

  • Ensure hitching points are secured/tightened.
  • Ensure locking pins are in place and engaged

Prepare intended work site:

  • clear debris, waste, tools or other potential tripping/entanglement hazards
  • establish an exclusion zone (no less than 10m from dig area)
  • clear surface obstructions (grass clumps, rocks, shrubs/weeds etc)
  • clear people from area

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Mini Excavator Safe Work ProcedureMini Excavator Safe Work Procedure
Mini Excavator Safe Work Procedure
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Bobcat loader, skid steer work method statement, safe work procedure, standard operating procedureBobcat loader, skid steer work method statement, safe work procedure, standard operating procedure
Bobcat - Skidsteer SWP
Circular Saw Safe Work Procedure (Handheld) (CLONE)Circular Saw Safe Work Procedure (Handheld) (CLONE)
Circular Saw Safe Work Procedure (Handheld)