Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Plasterer Stilts - Safe Work Procedure
Plasterer Stilts Safe Work Procedure

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Plastering Stilts Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the safety steps for Plasterers using Stilts.
The Plastering Stilts procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Plasters Stilts Work Method Statement can be used as part of your OHS induction, for Tool box talks or tender applications.

The Plastering Stilts Safety Procedure includes:
•    PPE
•    Safety Notes
•    Planning
•    Preparation
•    Plastering with Stilts On
•    Emergency Procedures
•    References
•    5  page procedure
•    Microsoft Word Format
•    Add site specific details and risks
•    Make it task specific
•    Instant Email delivery

Safety Notes for using Plasterers Stilts:
Plastering Stilts must only be used for short-term work such as installation of insulation/furring channels, patching and stopping of joints using trowels, fixing cornices and minor hand sanding. They are NOT to be used for installation of plaster sheets.
Main hazards:
- falls from height (including through windows and over perimeter guardrails)
- posture changes that can cause manual handling injuries
Seek advice from your State for particular risk controls that must be met. Use of Plasterer Stilts is prohibited in NSW.

Related items for Plasterers:
•    Cornice Fixing
•    Plasterboard Fixing
•    Plasterboard Setting

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Plasterboard Fixing Safe Work Method StatementPlasterboard Fixing Safe Work Method Statement
Plasterboard Fixing Safe Work Method Statement
Plasterboard Setting Safe Work Method StatementPlasterboard Setting Safe Work Method Statement
Plasterboard Setting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Cornice Fixing Safe Work Method StatementCornice Fixing Safe Work Method Statement
Cornice Fixing Safe Work Method Statement