Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Tower Crane Work Method Statement
Tower Crane Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Tower Crane Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the steps for safely drilling samples.

This SWMS covers the erection, operation and dismantle of a tower crane. A tower crane means a crane with a boom that is mounted on a tower structure and includes self-erecting tower cranes.

The Tower Crane procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Tower Crane Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE

  • Safety Notes

  • Planning

  • Preparation

  • Pre- operational inspection

  • Operation

  • Maintenance

  • Emergency Procedures

  • Employee sign off

References:

  • OHS Legislation in all States
  • DEIR QLD – Tower Crane Code of Practice (2006)
  • AS 2550 – Cranes, Hoists and Winches – Safe Use – Part 1: General Requirements, and Part 4: Tower cranes
  • Health and Safety Executive – Safety Alerts on Tower cranes (2006)
  • WorkSafe Victoria – Code of Practice for Plant
  • 12 page procedure

  • Microsoft Word Format

  • Add site specific details and risks

  • Make it task specific

  • E-mailed out


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Table Planner Safe Work Method StatementTable Planner Safe Work Method Statement
Table Planer Safe Work Method Statement
Thicknesser Safe Work Method StatementThicknesser Safe Work Method Statement
Thicknesser Safe Work Method Statement
Tig Welding Safe Work ProcedureTig Welding Safe Work Procedure
Tig Welding Safe Work Procedure
Tiling - Wall & Floor Work Method StatementTiling - Wall & Floor Work Method Statement
Tiling - Wall & Floor Work Method Statement