Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Borehole Drilling Samples Work Method Statement
Borehole Drilling Samples

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Borehole- Drilling Samples Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure outlining the steps for safely drilling samples.

This SWMS covers general safety issues with borehole drilling and sample drilling using a drill rig/auger mounted to vehicle.

The Borehole- Drilling Samples procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Borehole- Drilling Samples Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre- operational inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Employee sign off

References:
  • OHS Legislation in all States
  • Safety health Alert – WorkSafe WA – Post Hole Digger
  • Guidance Doc – WorkSafe Victoria – Tractor Driven Post Hole Diggers – Entanglement
  • Hawkline Owners Manual – Mounted Post Hole Digger.
  • WorkSafe Victoria (2007) Planning for Safer Plant Operations
  • AS4839:2001 The safe use of portable mobile oxy-fuel gas systems for welding, cutting, heating and allied processes.
  • NT WorkSafe (2008) Hot Work Permit Checklist Sample
  • OHS Acts and accompanying Regulations in all States
  • Australian Standard  2550.5 – 2002 Cranes, hoists and winches—Safe use Part 5: Mobile cranes
  • ASCC (pre – NOSCH) National Certification Requirements/Technical Standard

  • 13 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • E-mailed out

Emergency Procedures:
  • Develop and implement an emergency response plan for the site. Include:
  • assembly points
  • communication
  • responsible persons
  • emergency contacts (including nearest medical facility)
  • fire fighting plans

For larger fire outbreaks – call 000

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Site Clean up, Construction Cleaner, Cleaning BuildupSite Clean up, Construction Cleaner, Cleaning Buildup
Clean Up Procedure For Building Sites
Brick Laying Safe Work Method StatementBrick Laying Safe Work Method Statement
Brick Laying Safe Work Method Statement
Boom Lift Safe Work Method StatementBoom Lift Safe Work Method Statement
Boom Lift Safe Work Method Statement
Brake Press Work Method StatementBrake Press Work Method Statement
Brake Press Work Method Statement