Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Hot Work - Safe Work Method Statement
Hot Work Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Hot Works Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure outlining the safety steps for  Hot Works undertaken either indoors or outdoors.  It does not include work being carried out in confined spaces or on bulk tanks/vessels that contain/ed flammable materials or other dangerous goods.

The Hot Works procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Hot Works Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Hot Works Safety Procedure includes:

·     PPE

·     Planning

·     Preparation

·     Operation

·     Emergency Procedures

·     References

·     8  page procedure

·     Microsoft Word Format

·     Add site specific details and risks

·     Make it task specific

·     Instant download delivery


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Ladders Safe Work Method StatementLadders Safe Work Method Statement
Ladders Safe Work Procedure
Grinder Safe Work Method Statementgrinding safety, hand grinder, Work Method Statement,
Grinder Safe Work Method Statement