Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Pressure Cleaning - Using Steam Safe Work Method Statement
Pressure Cleaning - Using Steam Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Pressure Cleaning - Using Steam Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure outlining the safety steps for using petrol/diesel operated high pressures cleaners – including steam. This SWMS includes working from a cherry picker/working at heights and use of cleaning chemicals (such as paint strippers, degreasers, chlorine hydrochloric acid and caustic soda). 

The Pressure Cleaning – Using Steam procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Pressure Cleaning - Using Steam procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Pressure Cleaning - Using Steam Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation and Set-up
  • Operation
  • Refueling
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 13 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:


Planning:

Conduct risk assessment to determine whether spraying is appropriate. Consider:
  • Material safety data sheet (MSDS) (for chemicals).
  • Traffic management requirements/pedestrian access
  • How over-spray will be contained
  • Weather conditions
  • Duration of task
  • Near-by property (cars, buildings, homes etc)
  • Near-by ignition sources/electrical sources
  • Near-by persons (employees/pedestrians)
  • Type of respiratory protective equipment required
  • Material to be sprayed (no asbestos-containing material, glass or other fragile surfaces)
  • Work at heights
  • EPA requirements/restrictions
  • Occupational exposure limits
    
Establish Spray Area:
  • Provide signs/barriers to designate spray area
  • Ensure area is large enough to protect persons/property from exposure to overspray
  • Restrict entry
  • Isolate ignition sources at least 6m from cleaner (including light switches, motors, smoking, Class 3 dangerous goods, hot works etc)
  • Provide screening where possible
  • Use noise reducing nozzle (silencer)

Lift unit by handles using mechanical aids, or team lift.

For outdoor use only (carbon monoxide build-up).

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Ladders Safe Work Method StatementLadders Safe Work Method Statement
Ladders Safe Work Procedure
Plumbing Hot & Cold Water Rough In Safe Work Method StatementPlumbing Hot & Cold Water Rough In Safe Work Method Statement
Plumbing Hot & Cold Water Rough In Safe Work Method Statement
Polyethylene Pipe Butt Welding Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.Polyethylene Pipe Butt Welding Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.
Polyethylene Pipe Butt Welding Safe Work Procedure or Work Method Statement