Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Work Station Ergonomics Safe Work Method Statement
Work Station Ergonomics Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Work Station Ergonomics Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure outlining the steps for setting up an office work station.

This SWMS concerns the set-up of an office-based computer workstation to eliminate, or reduce as far as is reasonable, the risk of employees receiving a manual handling-related injury.

The Work Station Ergonomics procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Work Station Ergonomics Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Work Station Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre operational checks
  • Operation
  • Maintenance
  • Emergency Procedures

Product Details:
  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Pre Operational Inspection:

Check all equipment. Ensure:
  • Adjusters functional
  • Chairs are undamaged, stable and secure (check wheels/casters, seats, backrests, arms as applicable)
  • Flooring in good condition – matting is provided to assist movement of wheeled chairs (if required)
  • Tools and equipment are in easy reach when seated
  • Anti-glare screens are fitted (if required)
  • Do not use furniture or equipment that is faulty, damaged or non-functioning. Remove fro service, report to supervisor immediately and follow tag-out/lock-out procedures.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
Working Around Electricity Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.Working Around Electricity Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.
Working Around Electricity Safe Work Procedure or Work Method Statement
Ladders Safe Work Method StatementLadders Safe Work Method Statement
Ladders Safe Work Procedure