Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Concrete Batching Machine Safe Work Method Statement
Concrete Batching Machine Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Concrete Batching Machine  Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure. This SWMS covers the operation of a bin-fed mobile Concrete Batching Machine. This does not include self-loading units, or operation of front end loaders, cranes, forklifts, concrete agitator trucks, accessories such as silos etc, or confined space entry.

The Concrete Batching Machine procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Concrete Batching Machine Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Concrete Batching Machine Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre- operational Inspection
  • Transport, Loading & Unloading of unit
  • Operation
  • Maintenance & Clean up
  • Emergency Procedures
  • References

Product Details:
  • 10 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Planning:

Check for overhead power-lines or other obstructions before raising feed/discharge chutes

Operate unit as per manufacturer’s specifications. Do not leave unit unattended during operation.

Check conveyors/chutes continuously for unusual movement, shaking or pressure release. Discontinue use immediately if detected.

No persons to be working near discharge chute without suitable PPE. Do not touch wet cement without PPE.

Price: $79.95 


Quantity:   




Concrete Preparation and Laying Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.Concrete Preparation and Laying Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.
Concrete Preparation and Laying Safe Work Procedure or Work Method Statement
Cement Mixer Usage Work Method StatementCement Mixer Usage Work Method Statement
Cement Mixer Usage Work Method Statement
Concrete Pumping With Truck Mounted Placing Boom Safe Work Method StatementConcrete Pumping With Truck Mounted Placing Boom Safe Work Method Statement
Concrete Pumping With Truck Mounted Placing Boom Safe Work Method Statement
Cement Render Safe Work Method StatementConcrete Rendering Safe Work Method Statement
Cement Render Safe Work Method Statement